The MCBs need to be clipped on to the Din bar along with the busbar right into a recent flowing terminal and tight screwed to present existing to your MCBs.Two 16/25mm tail cables, a single neutral and the opposite active are connected to the main double pole switch of the meter. The key earth cable really should be screwed to the earth block, and